logo
980.349.0324
  • Home
  • Products
  • Contact

TF-2012 | S-Curve

Hide Search Options

Min - 0


Max - 175000


Search
(ex. VK-1032, 1032, or island)

Search within these Product Galleries ...

 
Previous | Back to Product Gallery | Next
advanced search | return home
  • Details
  • Description
  • Accessories
  • Specs
  • Print
  • Buy
Aero Push-button ConnectorBasic Assembly Aero Overhead Hanging Sign 2D S-Curve
TF-2012 (2D) S-Curve Hanging SignAero Push-button ConnectorBasic Assembly Aero Overhead Hanging Sign 2D S-CurveAero Overhead Hanging Signs Photos

Purchase

$1718
More Prices by Size
 FramePillowcase Graphic(s)Opaque Liner
6' x 36" $886 $832 $95
8' x 36" $898 $1109 $126
8' x 60" $1061 $1848 $210
10' x 48" $956 $1848 $210
10' x 120" $1587 $4962 $525
12' x 48" $966 $2218 $252
12' x 84" $1276 $4168 $441
12' x 144" $1943 $7145 $756

Custom Sizes Available by Quote. Just Ask.

Ask for Graphic Dim Specs by Size

Base Price Excludes Opaque Liner

  • Aero Overhead Hanging Signs
  • Hanging Sign with Pillowcase Fabric Graphic
  • TF-2012 (2D) S-Curve
  • Lightweight CNC-Milled Aluminum Tubes
  • Easy Push-button Assembly
  • Pillowcase Tension Fabric Graphic(s) with Industrial Zipper
  • Vibrant 8-Color Dye-Sublimation Printing
  • Engineering Certified Hanging Hardware
  • Includes Durable Nylon Bag with Carrying Straps

  • See "More Prices by Size" for Prices/Details
  • 6' x 36"
  • 8' x 36"
  • 8' x 60"
  • 10' x 48"
  • 10' x 120"
  • 12' x 48"
  • 12' x 84"
  • 12' x 144"
  • Custom

  • Packaging: TF-950 — Durable Folding Nylon Bag with Straps (Before Fold: 60" W x 12" D x 12" H)
  • OR TF-916 — Roto-molded Case with Handle and Wheels for an Additional Cost (26" W x 11" D x 56" H exterior)
  • Larger, Smaller, and Custom Sizes Available
  • Made in the USA

    Portable Assembly: Push-button Connectors, Carabiners, and Zippers (no tools)

Aero Hanging Signs
Add to My Gallery
Ships in 15 Business Days
More Aero Overhead Hanging Signs
Aero Overhead Hanging Signs
Contact Us
Work with a Designer
Permanent link to this design: http://www.heliosexhibitiongroup.com/eds/perma/default/tf-2012--s-curve/981/

Aero Overhead Hanging Signs

Aero Overhead Hanging Signs

TF-2012 (2D) S-Curve Hanging SignTrade shows and events are dominated by large hanging signs. Why? Because they attract attention. But great overhead hanging signs do more than just attract attention -- they draw enthusiastic crowds to your booth. Aero 3D and 2D Hanging Signs are designed to bring potential customers to your exhibit. Made with lightweight aluminum tubes and push-button connectors, Aero Hanging Signs complement the most imaginative trade show display.

Aero Push-button ConnectorChoose from 18 standard shapes -- rounds, squares, pinwheels, rectangles, and triangles -- and over a one hundred sizes. Each piece is numbered for quick assembly, and the aluminum tubes pack in a durable zippered fabric bag. All components are milled to CNC tolerances. Don’t see the perfect shape for your display? Let us design one just for you. Click on the “Contact Us” button to request prices and additional information. Or give us a call.

Aero Overhead Hanging Signs are Proudly Made in the USA.
 

Benefits and Features:

  • Lightweight Aluminum Tubes
  • Vivid Tension Fabric Pillowcase Graphics
  • High Quality CNC Construction
  • Easy Push-button Connector Assembly
  • Numbered Components
  • Design Specific Instructions
  • Backlighting and Rotating Options
  • Made in the USA
Contact us for more information about this design.
Send Me More Information
Aero Hanging Signs

MOD-550 Roto-molded Case

$575
  • MOD-550 Portable Clamshell Case (LT-550) (MOD-550)
  • Excludes Internal Jigging for Display Components
  • Dims: 26" W x 11" D x 56" H (exterior)
  • Dims: 23.5" W x 10" D x 48" H (interior)
  • Weight: 34 lbs. (empty)
  • Dimensional Weight: 80 lbs.
  • Roto-molded Clamshell Case with Straps and (2) Wheels
  • Molded Top Handle
  • Side Strap Handle
TF-2012 | S-Curve

Documentation for TF-2012 | S-Curve

  • Setup Instructions (122.53 KB pdf)
  • Request Graphic Dimensions
  • Fabric Options (607.74 KB pdf)

Frequently Asked Questions

  1. What's a 2D shape? A 3D shape?

    Think of a 2D Aero Overhead Hanging Sign as a two-sided sign. It can be a circle, a rectangle, an ellipse, or just about any shape.

    A 3D hanging sign, on the other hand, has multiple surfaces with the most notable shapes being a pinwheel, a circle, or a square.

    For example, TF-1001 Circle and TF-1007 Pinwheel are examples of 3D Hanging Signs. TF-2002 Rectangle and TF-2008 Ellipse are examples of 2D Hanging Signs.

  2. How do Aero Overhead Hanging Signs assemble?

    The lightweight aluminum 1.25" tubes assemble with attached push-button connectors. No tools are required to assemble an Aero Hanging Sign. Each piece is individually numbered and the numbers correspond to setup instructions created specifically for your display. There's no guesswork.

    The tension fabric graphic wraps around the frame and is secured with heavy-duty zippers.

    It's amazingly simple.

  3. What if I need a shape not shown on your website?

    Give us a call. About half our business is custom shapes. We’re happy to design and quote whatever shape and size you need.

  4. What are the prices for the Aero Overhead Hanging Signs?

    There are over 100 sizes of Aero Overhead Hanging Signs with multiple options for each size, such as one-sided printing, two-sided printing, bottom enclosures, rotating motors, etc.

    For all the standard sizes, you'll see prices listed in two places. There's the price for the the most common size. For all other sizes, there's a "More Prices by Size" button where additional sizes are listed with features. 

    Need a price for a custom size or shape/ Give us a call or send us an email. We can provide you with a competitive price very quickly.

More Frequently Asked Questions

Product Warranty

Classic Exhibits Inc. warranties the performance of its portable, modular, and custom hybrid systems during normal use, excluding excessive wear and tear, as per the instructions. This covers the workmanship and locking systems as long as the exhibit has a useful life. All remaining parts are covered against defective materials or workmanship as long as the exhibit is in service. The warranty is transferable should the product be sold or assigned to another party.

The manufacturer cannot be held responsible for damages due to abuse, misuse, or shipping damages. This warranty does not cover laminate cracks and chips, wood crate and roto-molded case damage (excluding workmanship), aluminum extrusion scuffs, mars, and scratches from normal use, and graphics wear and tear or misuse. The manufacturer is not responsible for lost or missing parts once the owner has assembled, accepted, and used the product.

Should there be any questions regarding the warranty, please contact your local Classic Exhibits Distributor.

Lead Time

The lead time for the TF-2012 | S-Curve is 15 Business Days.

  • Production lead times are based on business days and DO NOT include any shipping days.
  • Production-ready artwork (when applicable) must accompany the order confirmation. Delays in uploading artwork may lead to expedited charges or shipping changes.
  • No order will be released to Production without a signed order confirmation.
  • Shipping is based on the availability of materials and graphics. Additional charges may apply if materials or graphics must be expedited.
  • Shorter lead times may be available based on schedule openings in Customer Service and Production. Rush charges may apply.
  • Standard lead times do not apply to orders of multiple quantities.
  • Please check for product availability on ALL RENTAL exhibits.

Exhibit Weight

Exhibit Weight varies depending on the packaging and the shipping method. Variables include but are not limited to:
  • Dimensional Weight vs. Actual Weight: Dimensional weight is defined as crate or case size. On most air shipments, the dimensional weight exceeds the actual weight
  • Portable Cases vs. Wood Crates or Molded Tubs (where applicable): Exhibit designs that require one wood crate would require multiple portable cases. Selecting one vs. the other affects the total weight (dimensional or actual).
  • Freight Carrier: LTL carriers (Less than Truckload) quote freight based on space used. UPS, FedEx, and air freight carriers quote freight based on either the dimensional or the actual weight of the shipment.
  • Freight Service Level (number of days): Service levels range from Same Day Delivery to Two Week Delivery.
For more information about exhibit weights and freight options, please contact your local exhibit representative.

Electrical/Cord Management

Electrical, Cord, and Wire Management varies depending on the display and each exhibitor's requirements. When ordering your trade show display, consider the following electrical/wire management issues and discuss your options with an exhibit professional:
  • Inline vs. Island Displays
  • Lead Retrieval Devices
  • Computer and Monitor Cables
  • Demo Equipment
  • Overhead Lighting
  • Grommets and Grommet Placement in Counters
  • Overhead vs. Floor Power Supply
  • Flooring and Electrical Wiring
  • Options for Hiding Cords and Cables
  • Flat vs. Round Electrical Cords
  • Multi-Plug Outlets and Extension Cords
By reviewing your wiring options BEFORE you order your display, you'll save TIME and MONEY and ensure your exhibit exceeds your expectations and your installation is trouble-free.

Add designs and photos to your personal gallery simply by clicking on the +My Gallery links

Then email your "My Gallery" to colleagues, friends, or your favorite exhibit designer. There's no better way to begin designing a display that reflects your exhibit marketing goals.

Note: My Gallery uses a temporary browser cookie to store your gallery. We recommend that you send your gallery to your email address if you need to retain it for longer than 30 days.

  • Production lead times are based on business days and DO NOT include any shipping days.
  • Production-ready artwork (when applicable) must accompany the order confirmation. Delays in uploading artwork may lead to expedited charges or shipping changes.
  • No order will be released to Production without a signed order confirmation.
  • Shipping is based on the availability of materials and graphics. Additional charges may apply if materials or graphics must be expedited.
  • Shorter lead times may be available based on schedule openings in Customer Service and Production. Rush charges may apply.
  • Standard lead times do not apply to orders of multiple quantities.
  • Please check for product availability on ALL RENTAL exhibits.
Exhibit Weight varies depending on the packaging and the shipping method. Variables include but are not limited to:
  • Dimensional Weight vs. Actual Weight: Dimensional weight is defined as crate or case size. On most air shipments, the dimensional weight exceeds the actual weight
  • Portable Cases vs. Wood Crates or Molded Tubs (where applicable): Exhibit designs that require one wood crate would require multiple portable cases. Selecting one vs. the other affects the total weight (dimensional or actual).
  • Freight Carrier: LTL carriers (Less than Truckload) quote freight based on space used. UPS, FedEx, and air freight carriers quote freight based on either the dimensional or the actual weight of the shipment.
  • Freight Service Level (number of days): Service levels range from Same Day Delivery to Two Week Delivery.
For more information about exhibit weights and freight options, please contact your local exhibit representative.
Electrical, Cord, and Wire Management varies depending on the display and each exhibitor's requirements. When ordering your trade show display, consider the following electrical/wire management issues and discuss your options with an exhibit professional:
  • Inline vs. Island Displays
  • Lead Retrieval Devices
  • Computer and Monitor Cables
  • Demo Equipment
  • Overhead Lighting
  • Grommets and Grommet Placement in Counters
  • Overhead vs. Floor Power Supply
  • Flooring and Electrical Wiring
  • Options for Hiding Cords and Cables
  • Flat vs. Round Electrical Cords
  • Multi-Plug Outlets and Extension Cords
By reviewing your wiring options BEFORE you order your display, you'll save TIME and MONEY and ensure your exhibit exceeds your expectations and your installation is trouble-free.
Scroll to Top
Exhibit Design Search Home

Exhibit Design Search

  • My Gallery (0)
    • Photos
      • Past Five Days (P5D)
      • Custom Exhibits Gallery
      • Rental Photo Gallery
      • Retail Displays Gallery
  • The Top 20
  • Trade Show Tips
  • FAQ
  • Exhibit Specials
  • Lightning Deal
  • more ...
    • Advanced Search
    • Request A Design
    • Fabric Color Swatches
    • Lead Time
    • Exhibit Weight
    • Electrical/Cord Management

Aero Overhead Hanging Signs

  • Aero Overhead Hanging Signs

Modern Island & Inline Exhibits

  • Modern Island Exhibits
  • Modern Inline Exhibits
  • LED Lightbox Exhibits
  • Lightboxes & Banner Stands
  • RENTAL | Island Exhibits
  • RENTAL | Inline Displays
  • Eco-Systems Sustainable Islands
  • Eco-Systems Sustainable Inlines

Portable Displays

  • 10 x 10 Portables
  • 10 x 20 Portables
  • Floating Graphic Pop Ups
  • Quadro Pop Up Displays

Charging Stations, iPad Stands, Table Tops, & Hanging Signs

  • Charging Tables and Kiosks
  • iPad & Surface Stands
  • Table Top Displays
  • Aero Overhead Hanging Signs

Counters, Monitors Stands, & Kiosks

  • Counters & Pedestals
  • Monitor Stands and Kiosks
  • Eco-Systems Counters & Kiosks
  • RENTAL | Accessories

Contemporary Office & Retail Solutions

  • PlaceLyft Office/Medical
  • Safety Dividers
  • Hand Sanitizer Stands
  • Office/Retail Lightboxes

Virtual Exhibits, Pops-Ups, Banner Stands, & Table Throws

  • Virtual & Interactive Displays
  • Tension Fabric Pop-Ups (OP)
  • Stands, Table Throws & Outdoor Displays (OP)
  • Cases and Crates

Contemporary Rental Furniture, Flooring, & Lighting

  • Rental Furniture #1 (CT)
  • Rental Furniture #2 (CT)
  • Flooring | Carpet & Other (BR)
  • Lighting (DS)
Helios Exhibtion Group

Tel: 980 349 0324

Copyright © 2026 Helios Exhibtion Group